News_MasterPlan: West Chester University Campus Master Plan Final Update via WCU Website
It’s not every day we get all the answers to most of our issues and problems with the infrastructure of this school. They addressed these concerns and more in one simple email.
On March 19, in an email to students and faculty, Todd E. Murphy, the vice president for finance and administration, introduced us to the campus master plan draft: “Over the past year, we have worked diligently to develop the CMP—a strategic framework and 10+ year vision to enhance WCU’s physical campus. In partnership with planning and design experts from Ewing Cole, we have gathered valuable input from the WCU community, ensuring that this plan reflects our shared goals and aspirations for the future.” Some of the focuses include elevating the WCU experience, improving campus connectivity, strengthening campus identity and expanding student housing, which has been under the most scrutiny from students.
Let’s start with the 0-5 year plans the University wants to implement. To note, things will start to happen in the fall of the next academic year, and these plans as of now have a 2025-2030 time range. They are listed as “opportunities” the University could take and are not necessarily set in stone. For academic infrastructure, the University wants to renovate the Science Center Complex and the Old Library, which houses the Museum of Anthropology and Archaeology. The Old Library was also first built in 1902. Sturzebecker is being looked at for renovation too, and Sykes Student Union is being eyed for an expansion to its student services, dining and welcome center.
On the housing side, the temporary housing that’s being called Matlack Courts is listed as part of the University’s campus master plan. They detail that Matlack Courts can be housing for approximately five years, starting from the fall of 2025 to the spring of 2030. Lawrence Hall is being looked at to be demolished in the summer of 2027 and completely turned into housing. Lawrence Hall was where the old dining hall sat before the Science & Engineering Center & The Commons (SECC) was opened. Lawrence also houses the Counseling Center, Career Development Center and Success Coaching services. Einstein Bros. Bagels, the Office of Residence Life and Housing and the Center for Women & Gender Equity are there, too. There was much speculation after the SECC was officially opened if the University was going to turn it into housing or not, and it turns out they will. Also listed in this time frame is that south campus is to receive full renovations and a vertical expansion. They’re looking to either improve or build a new south campus commons building, but a future location hasn’t been provided.
For the range of 6-10 years, the university wants to make improvements on Church Street & University Ave and fully renovate Tyson and Goshen Hall with additions. Tyson Hall’s works are slated to possibly start in the summer of 2030 and finish in the fall of 2032, while Goshen’s improvements will start that same semester and end in the fall of 2034. Ram Park is slated to be relocated across Church Street, and a South Campus Gateway connection to Sturzebecker is slated to be added by the University. Farrell Stadium is set to have improvements like field amenities, restrooms, concessions and more.
Killinger Hall is set to be demolished in the summer of 2034, with a brand new Killinger Hall being completely rebuilt in its place and completed in the summer of 2037. Schmidt Hall is having a full renovation and a new entryway for students, with work starting in the summer of 2037 and completed in the summer of 2039. The University is looking into a land acquisition to complete a so-called “superblock” from the corner of Sharpless & South High Street, with no other specific details mentioned. A Sykes Student Union Parking Deck will be added, and recreation improvements will be made from the corner of Rosedale Avenue to New Street. EO Bull Center for the Arts is set to have an expansion and landscape improvements. They also want to study the Tanglewood Residence & Grounds and see what the highest and best use of the property is. The President’s Walk will have an extension in the form of landscaping and Gordon Preserve Trail Connections. A new multi-modal transportation system and a bike share program are also in the works, though the plan doesn’t specify what these will entail.
It’s great to know that the University is looking into the improvements on the infrastructural side of this campus and issues that are specifically ones that students have been suggesting since my freshman year. This master plan will come with a huge price tag, so we’ll get the specifics soon on how all of this will be paid for. Until then, be on the lookout for any projects you see starting up around campus.
Isaiah Ireland is a third-year Media and Culture major. II978280@wcupa.edu.
